(Press release LanAspects / A5 Western Transport Corridor:) Northern Ireland, 31 July 2012 - Regional Development Minister, Danny Kennedy, today announced his decision to proceed with the A5 Western Transport Corridor dual carriageway project. This follows consideration of the Inspector’s Report into the A5 Public Inquiry, which was held last year. The Inspector’s Report and the Department’s Statement on the way forward have now been released. Funding for the two stretches of the A5 project, from New Buildings, Londonderry, to north of Strabane and from south of Omagh to Ballygawley, was announced on 14 February, subject to the outcome of the Public Inquiry.
Announcing his decision the Minister said: ‘The Inspectors recommended that the scheme should proceed as proposed by the Department, subject to a number of key recommendations, including the postponement of the Ballygawley to Aughnacloy section of the scheme and retaining the A4/A5 Tullyvar Road roundabout at Ballygawley. "I concur with the main recommendations contained within the Inspector’s Report and I am satisfied that the proposed scheme will help to improve road safety and provide a more appropriate standard of road on this key strategic route. "There are almost 1400 junctions and accesses onto the existing A5 which contribute to the potential for accidents along this route. The collision history is a factor which cannot be ignored and the A5 upgrade will help to reduce the number of collisions by providing improved cross sections, forward visibility and alignment as well as separating strategic and local traffic.’
Commenting on the representations to the Public Inquiry Danny Kennedy said: ‘I am well aware of the strong local opposition to some elements of the scheme. I can assure those affected that Roads Service will continue to have discussions with affected landowners with a view to resolve, where possible, any outstanding individual difficulties." The Minister concluded: "The strategic road network is the arteries of the Northern Ireland economy, linking towns, cities, air and seaports to help boost industry and commerce as well as facilitating tourist travel. The A5 Western Transport Corridor is one of five key Transport Corridors in Northern Ireland and this upgrade will not only have positive economic and construction industry benefits but also help towards balancing regional infrastructure.’
Funding in the current budget period is committed to constructing the two stretches of the scheme. The construction of the remainder of the scheme will be dependent on the availability of funding through the Investment Strategy for NI 2011-21 and subsequent budget settlements beyond 2015.
The Minister’s decision will be followed by the publication of the statutory order. This will pave the way for construction to start later this year.
The northern section of the scheme between New Buildings and Strabane will be constructed by the Balfour Beatty/BAM [Contractors] /FP Mc Cann Joint Venture and will provide 15 kilometres of new dual carriageway.
Construction of the southern section between Omagh and Ballygawley will be carried out by the Graham/Farrans Joint Venture and will provide 24 kilometres of new dual carriageway. At the southern end it is also proposed to upgrade the link between the new road and Ballygawley Roundabout to dual carriageway status thus ensuring continuous dual carriageway/motorway entirely between Omagh and Belfast. Work on both stretches is expected to start in the autumn this year and will take around two and a half years to complete.
The Inspector’s Report and the Department for Regional Development’s, (DRD) Statement on the way forward is available for viewing at the following offices:
Proposed scheme: http://www.a5wtc.com/downloads/Proposed%20Scheme.pdf