Wayss & Freytag Ingenieurbau has been awarded an 83 million euro contract for the construction of a 5.4 km long tunnel. The tunnel is part of the SMART project in Kuala Lumpur, capital city of Malaysia. SMART stands for ‘Stormwater Management and Road Tunnel’, a drainage tunnel of 11.83 metre internal diameter.